It was another lovely winter's day at Little Ennochie today with the sun streaming in ... it was a positively balmy 4 degC! This week has seen some really good progress in the utility block off to the east of the site. Inside this smaller building we now have a utility room, plant room, office and store room. The cloakroom is still boarded up from outside, but that obviously has walls up too now. We're really happy with the size of the space and also the amount of light that comes in ... a perfect south facing aspect. As mentioned in last week's blog, we have decided to build a small extension to this building to hold the wood pellet bulk hopper. As such, you will see from the photos below that we now have the hoses installed running along the roof of the store and down into the plant room where the boiler will be. Should be a neat and tidy solution in the end!
Inside the main extension, the fireplace has grown a bit since last week! Almost full height now. It is looking really great and we can't wait to see what it looks like once it is lime-pointed and has the stove insert added. No sign of roof glass again this week, hopefully next week will be the week!!
Master Bedroom thro' to ensuite |
Master Bedroom (looking back) |
![]() |
Family bathroom upstairs .. shower space |
![]() |
Guest bedroom ... wall is a little bit tight on the old window! |
![]() |
Guest ensuite |
Shower trays have arrived |
Doorway from Mill to Extension (plaster / brick / granite looks fab) |
Main extension - still one open space at the moment |
![]() |
Wads of cables ... this bunch is for the home entertainment! |
![]() |
Fireplace taking shape (log store at bottom) |
Utility room |
No comments:
Post a Comment