Hello again!,
I was still in the US this week, but didn't miss anything on site as nothing much else happened since we are still awaiting the reclaimed red brick samples that will be needed to start rebuilding the large door opening on the South wall. They should have arrived by now! In the meantime, some progress has been made on the piping runs for the utilities between the building spaces – water, service ducts and manifold locations for the under-floor heating. We’ve had to make some assumptions on things as we still haven’t decided on our heat source yet!
 |
Some pipe runs visible in foundations |
 |
The orange piping is for running services between buildings (this will be covered over in concrete) |
 |
Two service ducts near the utility room area |
 |
Hot and cold water pipes out to manifold locations and return flow |
 |
A view looking back from the utility/office building |