I'm slow in my blogging again folks! This week (13) was a busy one. In the space of 3 days we poured the concrete subfloor, laid the insulation and underfloor heating pipes, then poured the final floor screed to bring the floor to it's finished level. Busy busy. As I type (week 15) we're still struggling with some details on the floor and the heating plans but we hope to get there soon.
Pipes in the extension underway |
![]() |
Inside the mill - insulation only |
A cross section - pretty thick stuff for the floor |
The kitchen area before - note the trench in insulation, this is because they placed the dishwasher water/waste in the wrong place! It's fixed now!! |
looking to extension - taking shape |
![]() |
Pipes are pretty congested passing through the entrance hall |
![]() |
The Family Room |
Manifold in the plant room (there is one in the Mill also) |
Screed going down! |
... and down ... |
... and down ... |
Levelling the screed out ... |
Spaghetti junction! |
The glass hallway is a busy place! |
Inside the Mill ... screed all levelled out |
The East extension all finished |
The main extension now finished - machine there is for smoothing out the screed |
View of the finished extension floor and mill |